Skip to main content
/

Site Navigation

Your Account

Choose Language

Help
Editing Step 1 —

Step Type:

Drag to rearrange

Included with your heated bed are all of the parts necessary to connect into the electrical box, and install your bed to your existing metal plate.

During this procedure you will be exposing connection which during normal operation will see "mains" voltage (120/220VAC).

When working on any part of this procedure, ensure that the main power is disconnected from any power source, and USB cable is unplugged.

If you are not comfortable working with high voltage connections, consult a certified electrician to perform this procedure for you.

Your contributions are licensed under the open source Creative Commons license.